Steps Safety and Security

This faculty application, which has now been submitted, covers a range of work to improve safety and security around St. Paul's Church building.

Cellar Steps

The steps down to the cellar door are on the NE corner of the building.

Quotations from Quinquennial Report 2012:

Provide protective railings to the boiler house steps and introduce a handrail on one side fo the steps (Items which should be completed within the next 18 months).

Remove old fuel tank bund wall and make good to the paving. (Repairs which should be carried out during the Quinquennium)

Overhaul and repaint the railings to the E. boundary wall. (Items which should be carried out in the next 18 months.)

Pictures of the steps

(Click on a picture to zoom in)

A Picture of Cellar Steps looking SW from Montreal Street
A Picture of Cellar Steps looking SW from Montreal Street
A Picture of Cellar Steps close up


A Picture of Old fuel tank paving
A Picture of Paved area, with wall, and Montreal Street beyond
A Picture of Cellar Steps, looking from Montreal Street

Additional Information

Fire Exit

The fire exit is located on the SE corner of the church.

Quotations from Quinquennial Report 2012:

Redecorate guard rail to the Vestry steps in order to delay the future need for complete replacement of the guard rail. (Items of utmost urgency)

Hack out moss-covered paving in the area around the Vestry steps and relay with new tarmac including a suitable sub-base. (Repairs which could be carried out during the quinquennium)



A Picture of Fire Exit 1
A Picture of Fire Exit 2
A Picture of Fire Exit 5



A Picture of Fire Exit from the Inside

Additional Information:

Steps from the Community Garden

The steps are located at the SE corner of the church grounds.

Quotation from Quinquennial Report 2012:

Either close the southern boundary south-east corner gate so that it can no longer be used, or provide handrail guarding to the steps. (Items which should be completed in the next 18 months)



A Picture of Community Garden Steps 1
A Picture of Community Garden Steps 2


Additional Information:

The Main Entrance

The main entrance is located at the SW corner of the church building.



A Picture of The Main Entrance
A Picture of The South Elevation


Additional Information