# Quinquennial Report 2025: Work Plan and Progress

The priorities from the Quinquennial are copied below. The are also coded, in order of priority:

<table>
<thead>
  <tr>
    <th align="right">
      
    </th>
    
    <th align="center">
      
    </th>
    
    <th align="left">
      
    </th>
  </tr>
</thead>

<tbody>
  <tr>
    <td align="right">
      <span className="completed">
        crossed off
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="left">
      completed or unnecessary work
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <em>
        italics
      </em>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="left">
      comments, notes & thoughts appear like this
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section,lectred">
        RR
      </span>
    </td>
    
    <td align="center">
      —
    </td>
    
    <td align="left">
      Roof Repairs
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section,lectred">
        SF
      </span>
    </td>
    
    <td align="center">
      —
    </td>
    
    <td align="left">
      Sub Floor
    </td>
  </tr>
  
  <tr>
    <td align="right">
      
    </td>
    
    <td align="center">
      
    </td>
    
    <td align="left">
      
    </td>
  </tr>
</tbody>
</table>

And these are the Cost Bands:

<table>
<thead>
  <tr>
    <th align="right">
      
    </th>
    
    <th align="center">
      
    </th>
    
    <th align="center">
      
    </th>
    
    <th align="right">
      
    </th>
    
    <th align="center">
      
    </th>
    
    <th align="center">
      
    </th>
    
    <th align="right">
      
    </th>
  </tr>
</thead>

<tbody>
  <tr>
    <td align="right">
      <span className="qr-section">
        1
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      0
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      1,999
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section">
        2
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      2,000
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      9,999
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section">
        3
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      10,000
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      29,999
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section">
        4
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      30,000
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      49,999
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section">
        5
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      50,000
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      249,999
    </td>
  </tr>
  
  <tr>
    <td align="right">
      <span className="qr-section">
        6
      </span>
    </td>
    
    <td align="center">
      -
    </td>
    
    <td align="center">
      
    </td>
    
    <td align="right">
      over
    </td>
    
    <td align="center">
      
    </td>
    
    <td align="center">
      £
    </td>
    
    <td align="right">
      250,000
    </td>
  </tr>
</tbody>
</table>
</card>

<card>

## ITEMS OF UTMOST IMPORTANCE

a) <span className="qr-section,lectred">

SF

</span>

 Reinstate vents to external walls to provide a crossflow of ventilation to the subfloor areas. This work should include measures to provide openings within the new brick subfloor sleeper walls to encourage cross flow. (B2.2, B2.9, B2.11, B.2.12, B2.13, C1.1) <span className="qr-section">

2

</span>



b) <span className="qr-section,lectred">

SF

</span>

 Lift floorboards around the safe within community room to investigate cause of floor failure. (C1.1) (inspection only) <span className="qr-section">

1

</span>



c) <span className="qr-section,lectred">

SF

</span>

 Remove all timber, builders’ debris and other organic materials from subfloor areas. (C1.1) <span className="qr-section">

1

</span>



d) <span className="qr-section,lectred">

SF

</span>

 Repack joist ends around floors under community room using none shrinkable packings and slate pack and fill cracks in sleeper walls. (C1.1) <span className="qr-section">

2

</span>



e) <span className="completed">

Remove loose and cracking plaster to chancel arch.

</span>

 (C2.2) <span className="qr-section">

1-2

</span>



<span className="center">

**TOTAL SPENT SO FAR**: £0 - £9,999

</span>



<span className="center">

**TOTAL COST REMAINING** £4,000 - £33,000

</span>
</card>

<card>

## ITEMS WHICH SHOULD BE COMPLETED WITHIN THE NEXT 18 MONTHS

a) <span className="qr-section,lectred">

RR

</span>

 Install lead secret gutters and DPC’s (damp proof course) to roof / copings stones to the east gable to the nave and chancel. Refix any loose slates as part of this work. (B5.2, B5.3, B5.7, B5.8, C2.2, C2.3) <span className="qr-section">

4

</span>



b) <span className="qr-section,lectred">

RR

</span>

 Engage experience roofer to inspect the east section of the south aisle roof using high level access equipment to ascertain causes of water ingress. (B5.4) <span className="qr-section">

1

</span>



c) <span className="qr-section,lectred">

RR+

</span>

 Renew lead pitched valley and refix loose / misaligned ridge tiles to organ chamber. (B5.6) <span className="qr-section">

2

</span>



d) Redecorate corroding external railings. (B8.3) <span className="qr-section">

1-2

</span>



e) Remove loose and cracking plaster to east wall of chancel. (C2.3) <span className="qr-section">

1-2

</span>



f) Commission asbestos management survey if one does not exist. (C9) <span className="qr-section">

1

</span>



<span className="center">

**TOTAL SPENT SO FAR**: £0

</span>



<span className="center">

**TOTAL COST REMAINING** £32,000 - £83,994

</span>
</card>

<card>

## REPAIRS WHICH SHOULD BE CARRIED OUT DURING THE QUINQUENNIUM

a) Redecorate external door to the heating chamber. (B3.1) <span className="qr-section">

1

</span>



b) Review October 2021 roof inspection report and consider carrying out work to address the issues noted within this report. B5.1, <span className="qr-section">

2-3

</span>



c) Review and monitor heating and ventilation regime within the church building. (C2.2, C2.3, C4) <span className="qr-section">

1-2

</span>



d) Clean / treat walls with antifungal wash to remove black mould growth. (C2.2,C2.3) <span className="qr-section">

1-2

</span>



e) Monitor the ceiling at the east end of the north aisle and the chancel ceiling for further water ingress and failure of the plaster ceiling. (C3.2) <span className="qr-section">

1

</span>



f) Consideration should be given to the options available to achieve the Church of England’s target to be net zero carbon by 2030. (D4) <span className="qr-section">

1

</span>



<span className="center">

**TOTAL SPENT SO FAR**: £0

</span>



<span className="center">

**TOTAL COST REMAINING** £2,000 - £55,994

</span>
</card>

<card>

## DESIRABLE REPAIRS BUT WHICH COULD BE POSTPONED TO A FUTURE QUINQUENNIUM

a) Consider undertaking a planned programme of masonry repointing works using lime mortar to areas of cement pointing. (B2) <span className="qr-section">

5

</span>

 for all areas

b) Remove or renew defective light fitting and brackets to north aisle. (B2.2) <span className="qr-section">

1

</span>



c) <span className="completed">

Review bulging south boundary wall to staircase at the time of the next inspection

</span>

. (B8.3) <span className="qr-section">

1

</span>

 (inspection only)

d) Review condition of the nave, aisle and community room floors and subfloor areas, after carrying out the repairs noted above, at the time of the next inspection. (C1.1) <span className="qr-section">

1

</span>

 (inspection only)

e) Renew failing areas of plaster with lime plaster once walls are confirmed to be dry. (C2.2, C2.3) <span className="qr-section">

2-3

</span>



<span className="center">

**TOTAL SPENT SO FAR**: £0 - £1,999

</span>



<span className="center">

**TOTAL COST REMAINING** £52,000 - £284,996

</span>
</card>

<card>

## OTHER RECOMMENDATIONS

a) Plan to re-roof all areas of the church building within the next 10 to 20 years. Periodically review the condition of the south aisle roof as this roof appears to be in worse condition. (B5, B5.4) <span className="qr-section">

3-4

</span>



b) Clear north churchyard area of excessive vegetation growth. (B8.1) <span className="qr-section">

1-2

</span>



<span className="center">

**TOTAL SPENT SO FAR**: £0

</span>



<span className="center">

**TOTAL COST REMAINING** £10,000 - £59,998

</span>
</card>